Plant productivity · 10 guides
Get more work from every hired hour
Cycle times, fleet balancing, utilisation, standby and off-hire. These guides separate paid hours from productive hours and show where hire budgets leak.
Guides
10 practical guides
Cycle-time fundamentals
Turn a production target into machine, truck and shift requirements.
Fleet balancing
Prevent loaders, trucks and support plant from waiting on each other.
Useful utilisation
Separate available hours, operating hours and productive hours.
Fuel and refuelling
Plan burn rate, storage, access and refuelling without breaking the shift.
Shift handover
Transfer defects, hazards, fuel and production information cleanly.
Standby controls
Define weather, access, instruction and breakdown standby before work begins.
Attachment changeovers
Account for couplers, pressure, tooling, transport and change time.
Operator–machine fit
Experience with the task and control system affects output and wear.
Production reporting
Use short, repeatable measures that reveal lost time early.
Efficient off-hire
Stop charges cleanly with notice, inspection, cleaning and collection evidence.