Plant productivity · PL-07
Attachment changeovers
Account for couplers, pressure, tooling, transport and change time.

Account for couplers, pressure, tooling, transport and change time.
01 · Why it mattersWhat actually decides the outcome
Attachments multiply what one machine can do, but every changeover costs time. Hydraulic settings, couplers and tooling also need to be correct. Planning the sequence of tasks around attachments protects productive hours and prevents damage from mismatched hydraulic flow or pressure.
02 · Before you hireWhat to check
- Coupler type and compatibility
- Hydraulic flow and pressure settings
- Time per changeover
- Storage and protection of attachments
- Transport of attachments to site
- Operator familiarity with each tool
03 · Supplier questionsWhat to ask the hire company
- Is the machine fitted with a quick hitch compatible with these attachments?
- Are hydraulic settings pre-set for each tool?
- Are attachments charged separately?
Swapping between bucket and breaker several times a day because the tasks weren't sequenced.
04 · Put it in writingConfirm the assumptions
Record the nominated machine (make, model and configuration), the attachments, the transport method and the support arrangements in the hire agreement. If any assumption changes on site, the rate, programme or safe work method may change with it. Return it to the project team before the machine is dispatched.