Oversize transport basics
Machine dimensions, mass and route determine permits, escorts and timing.

Machine dimensions, mass and route determine permits, escorts and timing.
01 · Why it mattersWhat actually decides the outcome
Machinery that exceeds general width, height, length or mass limits in transport configuration needs access approvals or permits. It may also need pilots, escorts, route assessments and travel time restrictions. These add cost and lead time, and can decide which machine is practical for a site.
02 · Before you hireWhat to check
- Transport width, height, length and mass
- Removable counterweight and attachments
- Route restrictions and bridges
- Permit lead time
- Escort requirements
- Travel time windows
03 · Supplier questionsWhat to ask the hire company
- What is the transport configuration of the machine?
- Does this movement need a permit or escorts?
- What lead time is required?
Booking a large machine for a Monday start without realising the permit takes longer to issue.
04 · Put it in writingConfirm the assumptions
Record the nominated machine (make, model and configuration), the attachments, the transport method and the support arrangements in the hire agreement. If any assumption changes on site, the rate, programme or safe work method may change with it. Return it to the project team before the machine is dispatched.