Read the workface before choosing the machine

A machine brief starts with material, geometry, ground and movement—not the model name printed on an old scope.

Read the workface before choosing the machine

A machine brief starts with material, geometry, ground and movement—not the model name printed on an old scope. Use this guide to structure the conversation with suppliers, expose assumptions early and create a record that survives the handover from estimator to site supervisor.

Step 01Measure the duty

Record the quantity, material state, cut or lift geometry, travel path and required finish. Separate the typical cycle from the worst credible cycle so suppliers can test both productivity and capacity.

Step 02Map the physical envelope

Measure access width, headroom, gradients, bearing surface, underground services and swing space. A smaller machine that can work continuously may outperform a larger unit constrained by the workface.

Step 03Issue a comparable brief

Give every supplier the same inputs and request the proposed make, model, configuration, attachments and assumptions. Comparable answers expose risk earlier than headline day rates.

Record it

For each step, record the answer, where the evidence came from, who owns it and the date. If an answer changes the rate, programme or safe work method, take it back to the project team before the machine is dispatched.

ChecklistBefore you confirm the hire

  • Material and quantity
  • Maximum reach or lift
  • Ground-bearing condition
  • Access and swing envelope
  • Production target and finish

ContinueRelated tools and guides

FAQQuestions before dispatch

What should be confirmed in writing with the hire supplier?

Start with the field checks for this guide (material and quantity, maximum reach or lift, ground-bearing condition and so on). Then confirm the nominated make, model, configuration, availability, transport, support arrangements and every commercial assumption in the hire agreement.

Is this guide a substitute for engineering or legal advice?

No. It is a procurement and planning framework. Engineering, legal, safety and regulatory decisions must be made by competent people for the actual project and site.

When should this information go to suppliers?

Issue the core inputs before requesting quotes so every supplier prices the same scope. Update them when site conditions change, and carry the agreed assumptions into dispatch and pre-start documents.