Machine control systems
Models, calibration, base stations and site files need one data plan.

Models, calibration, base stations and site files need one data plan.
01 · Why it mattersWhat actually decides the outcome
Machine control guides excavators, dozers and graders to a design surface. It depends on correct models, calibration, base stations or network corrections, and a single data plan shared by surveyors and operators.
02 · Before you hireWhat to check
- Design model format and version
- Calibration and site localisation
- Base station or network corrections
- Operator training
- Data sharing between survey and field
- Verification checks
03 · Supplier questionsWhat to ask the hire company
- Which machine control system and file format?
- Who loads and updates the design model?
- Is survey support included?
Running machines on an outdated design model after a revision.
04 · Put it in writingConfirm the assumptions
Record the nominated machine (make, model and configuration), the attachments, the transport method and the support arrangements in the hire agreement. If any assumption changes on site, the rate, programme or safe work method may change with it. Return it to the project team before the machine is dispatched.